Contact Information: Staff@powerblockgroup.com
Location: East Wenatchee, WA
Website: https://powerblockgroup.com
We are excited to announce the opening of our 4 MW Bitcoin miner hosting facility in East Wenatchee, WA.
Our facility is scheduled to open on November, 2018.
______________________
What We Offer:
Clean Renewable Energy:
Our location and design utilizes the power of water and air. Hydroelectric power and free-air cooling feeds and maintains our low carbon footprint facility.
Reliable Grid:
From Wells Dam, to new power substation, new transmission lines, new switch gear, and new transformers.
Strong Telecom:
Local Fiber-Optic 4.5 star internet connectivity. New service and infrastructure to facilities with multiple redundant lines.
Secure Location:
The diverse geography provides a state that rarely experiences severe weather patterns. Our working facility provides physical presence with multiple lines of security.
24/7 Web Monitoring
Access to unit productions and temperatures as well as the ability to Start, Stop, or Restart your units 24 hours a day, 7 days a week from the comfort of your home or smartphone.
______________________
[ Please Note: We are only accepting ASIC's at this time.]
" It is our sincere commitment to our business and our members to provide an excellent hosting environment and mining experience. "
- Staff @ Power Block Group
For more information, visit our website: https://powerblockgroup.com
Questions? Feel free to contact us with any questions or concerns: Staff@powerblockgroup.com
Follow us on Twitter: http://twitter.com/powerblockgroup
Follow us on Instagram: https://www.instagram.com/powerblockgroup
---